Multiple WC's pumped at Pfizer plant Cork - Over ground pumps

Sanicubic 2 GR - 3 phase stand by twin grinder pump

Case Studies|

1 min read

|

Published on 9/1/2023

Multiple WC's pumped at Pfizer plant Cork - Over ground pumps

Pfizer Cork Ireland requirement was to pump waste water away from a basement toilet block which contained six WC's and wash basins.  The installation dictated that narrow discharge pipe work was a must. Also, this grinder pump required continuous usage in a location staffed 24 hours